P 377 Burj Al Fardan Lusail Project
  • Client –    Alfardan Group
  • Consultant –     Arab Engineering Bureau
  • Contractor –    IDC QATAR
  • Scope –    Thermal Stress Calculation Verification Of Vertical Riser CHW
  • Our Role –    Thermal stress verification of 32 floor storey tower riser piping calculation. Verification of thermal stress calculation of vertical riser chilled water piping. Manual stress calculation for 100 m risers along with its branches are analyzed per codes & standards.Worked as a Third Party reviewer for Contractor (IDC).
Qatar Rail Metro Underground Gold line for CCP Plant
  • Client –    Q-RAIL QATAR
  • Consultant –     Worley Parsons QATAR
  • Contractor –    ALYSJ JV QATAR
  • Scope –    CCP Plant Support Analysis & Design
  • Our Role –    Performed support selection & analysis for supports of Critical piping sizes of 700 DIA & above. Performed structural Design for shoe plate for all types of support (Rest, Rest+Guide, Hold-down+Guide,3-way restraint). Prepared shop drawing for all types of support (Rest, Rest+Guide, Hold-down+Guide,3-way restraint).
Workers hospital & integrated health center-Industrial area
  • Client –    Private Engineering Office (PEO)-QATAR
  • Consultant –     Dar Al Handasah
  • Contractor –    Voltas Limited Qatar
  • Software –    CAESAR II
  • Project Status –    Completed
  • Scope –    Performed Stress Analysis for existing chilled water Piping
  • Our Role –    Performed Stress Analysis for entire chilled water supply and return lines inside the Tunnel. Preparation of load data sheet for all the rigid supports and anchor locations. Support analysis of entire piping network.
Qatar Rail Metro Underground Gold line CHW Piping
  • Client –    Q-RAIL QATAR
  • Consultant –     Worley Parsons QATAR
  • Contractor –    ALYSJ JV QATAR
  • Software –    CAESAR II
  • Project Status –    Completed
  • Scope –    Performed Stress Analysis for existing chilled water Piping
  • Our Role –     Performed Stress Analysis for entire chilled water supply and return lines (including Chiller yard & Pump rooms). Dynamic analysis for plant room & chiller yard. Preparation of load data sheet for all the rigid supports and anchor locations. Support analysis for entire Chilled water piping network for all 11 stations of gold line.
Msheireb Downtown, Doha- Phase-4 for Corridor Chilled Water Piping
  • Client –    Consolidated Contractors Company
  • Software –     CAESAR II
  • Project Status –    Completed
  • Scope –    Stress & Structural analysis for corridor chilled water piping
  • Our Role –    Stress & Structural analysis for corridor chilled water piping. HDPE piping analysis for chilled water services. Support analysis for the entire Phase-4 (all services). Structural analysis and shop drawing preparation for the chilled water piping network.