Commercial Mall & Bridge Project in Qatar

Project

Commercial Mall & Bridge Project in Qatar

Location

Qatar

Status

Completed

Project Category

Commercial

Scope of Work

Smoke Simulation Study using CFD Analysis

Project Summary

  • 3D Model of the complete domain and its geometry including the location and sizes of the Air outlets.
  • Defining the boundary conditions and input parameters including the temperature, critical area and flowrate of the outlets and fresh air inlets.
  • Analysis of the system to understand the flow pattern and time taken for the smoke evacuation.
  • Evaluated the results and noted the critical areas.
  • Provided suitable Engineering recommendation to overcome the non-conformances noted