Project Scope
Project | : | Al Bayt Stadium |
Client | : | Confidential |
Consultant | : | Confidential |
Contractor | : | Confidential |
Sub Contractor | : | L&P JV |
GSAS Typology | : | GSAS v2.1 Sports |
Target Rating | : | 4-Stars |
Certification Status | : | LOC awarded |
Scope | : | Conserve has been appointed by M/s Leonardo Contracting to perform GSAS Construction stage documentation for specific MEP criteria and Performed Stress & Structural Analysis for Entire Stadium chilled water Piping & Fire Fighting piping. |
- Performed Stress Analysis for entire chilled water supply and return lines inside the ETS Room.
- Performed Stress Analysis for entire chilled water supply and return lines inside the whole stadium along with Risers.
- Performed stress analysis for Firefighting piping for entire stadium.
- Preparation of load data sheet for all the rigid supports and anchor locations.
- Support analysis of entire piping network.