Project Scope

Project Workers hospital& integrated health center-Industrial area.
Client Private Engineering Office (PEO)-QATAR.
Consultant Dar AlHandasah.
Contractor VoltasLimitedQatar.
Code Used ASMEB31.1
Software CAESAR II.
Project Status Completed.
Scope Performed Stress & Structural Analysis for Entire chilled water Piping Network.
  • PerformedStressAnalysisforentirechilledwatersupplyandreturnlinesinsidethe Tunnel.
  • Preparation of load datasheet for all therigid supports and anchorlocations.
  • Support analysis of entire piping network.