
Project Scope
Project | Workers hospital& integrated health center-Industrial area. |
Client | Private Engineering Office (PEO)-QATAR. |
Consultant | Dar AlHandasah. |
Contractor | VoltasLimitedQatar. |
Code Used | ASMEB31.1 |
Software | CAESAR II. |
Project Status | Completed. |
Scope | Performed Stress & Structural Analysis for Entire chilled water Piping Network. |
- PerformedStressAnalysisforentirechilledwatersupplyandreturnlinesinsidethe Tunnel.
- Preparation of load datasheet for all therigid supports and anchorlocations.
- Support analysis of entire piping network.