Project:Workers hospital& integrated health center-Industrial area.
Client:Private Engineering Office (PEO)-QATAR.
Consultant:Dar AlHandasah.
Contractor:VoltasLimitedQatar.
Code Used : ASMEB31.1
Software: CAESAR II.
Project Status :Completed.
Scope:Performed Stress & Structural Analysis for Entire chilled water Piping Network.

Description

  • PerformedStressAnalysisforentirechilledwatersupplyandreturnlinesinsidethe Tunnel.
  • Preparation of load datasheet for all therigid supports and anchorlocations.
  • Support analysis of entire piping network.