![](https://www.conservesolution.com/wp-content/uploads/2021/08/ABU-DHABI-CRUDE-OIL-1.png)
Project Scope
Project | Crude oil pipeline project |
Client | Confidential |
Consultant | Confidential |
Contractor | Confidential |
Project Status | Completed. |
Scope | Pipe stress analysis. |
Description | Performed sustain stress check, thermal stress check and occasional stress check. Preparation of load case combination for hogging & sagging, blast analysis. To design suitable pipe supports, size spring supports and other pipe support as required. |