Project Scope

Project Al Rayyan Stadium
Client Confidential
Consultant Confidential
Contractor Confidential
Project Status Completed.
Scope Structural Detail Engineering & Stress Analysis
Description Performed Stress Analysis for entire chilled water supply and return lines inside the ETS Room. Preparation of load data sheet for all the rigid supports and anchor locations. Support analysis of entire piping network.

Services