Qatar Rail Metro and Chilled Water (CHW) Piping Project

Project

Qatar Rail Metro and Chilled Water (CHW) Piping Project

Location

Qatar

Status

Completed

Project Category

Metro

Scope of Work

  • Comprehensive Stress Analysis for entire chilled water piping system
  • Support selection and analysis for critical piping (700 DIA and above)
  • Structural design of shoe plates for various support types including Rest, Rest+Guide, Hold-down+Guide, and 3-way restraint
  • Preparation of detailed shop drawings for all types of pipe support

Project Summary

Conserve Solutions performed thorough stress analysis on the entire chilled water piping network of the Qatar Rail Metro underground system. Using CAESAR II and following ASME B31.1 standards, the team evaluated piping stresses and designed shoe plates for critical pipe supports sized 700 mm diameter and above. The project encompassed multiple support types—rest, guide, hold-down, and multiaxial restraints—with associated shop drawings prepared for precision fabrication and installation. This work was pivotal in ensuring system robustness, operational reliability, and compliance with Qatar’s rigorous transit infrastructure standards.