Sewerage Treatment Project in Qatar
Project
Sewerage Treatment Project in Qatar
Location
Qatar
Status
Completed
Project Category
Pumping Station
Scope of Work
Surge analysis, Stress Analysis and Structural Analysis.
Project Summary
- Performed Surge Analysis for newly added 600 diameter piping system along with submersible pump inside existing tank.
- Performed Pump trip and Startup timings.
- The analysis confirms that the sewage water pumping station requires pressure surge protection.
- Stress Analysis and Support Analysis for the H2SO4 Network is analyzed to note the critical failures and support locations for the network.