Desalination Plant Project in Qatar

Project

Desalination Plant Project in Qatar

Location

Qatar

Status

Completed

Project Category

Pumping Station

Scope of Work

Stress Analysis & Structural Analysis

Project Summary

  • Stress Analysis of external Chilled Water Network inside the CCP Plant.
  • Stresses in the Chilled Water Network inside the Pump Room and Chiller Yards have been analyzed and critical failures are noted and resolved.
  • Dynamic Analysis for Pump Room and Chiller Yards.
  • Structural Support analysis has been carried out based on the Loading outcomes from Stress Analysis.
  • 2D Fabrication drawings are prepared based on the qualified members along with its connection details.