![](https://www.conservesolution.com/wp-content/uploads/2021/08/Central-utility-Plant.jpg)
Project Scope
Project | Wildcat point generation facility |
Client | Confidential |
Consultant | Confidential |
Contractor | Confidential |
Project Status | Completed. |
Scope | Structural Engineering Design & Detailing. |
Description | Performed Stress Analysis for 36” piping covers Rotating equipment’s. Stress analysis performed for super critical temperature of 1450 F (787.77 C). Support Analysis for entire piping networks. Prepared shop drawing for all types of support in piping network. |