Workers Hospital & Integrated Health Center – Industrial Area

Project

Workers Hospital & Integrated Health Center – Industrial Area

Location

Qatar

Status

Completed

Project Category

Health Care

Scope of Work

  • Stress Analysis for Existing Chilled Water Piping
  • Preparation of Load Data Sheets for Rigid Supports and Anchor Locations
  • Support Analysis of Entire Piping Network

Project Summary

Conserve Solutions performed detailed piping stress analysis for the chilled water supply and return lines inside the tunnel of the Workers Hospital and Integrated Health Center in the industrial area. Using CAESAR II software and following ASME B31.1 standards, the study included sustained, thermal, and occasional stress checks to ensure system reliability and safety.

The scope encompassed comprehensive support analysis along the piping network along with calibrated load data sheet preparations for all rigid supports and anchors, facilitating efficient structural integrity and installation readiness.

This project reflects Conserve’s expertise in healthcare facility piping systems and compliance with rigorous engineering codes in Qatar.