Pumping Station & Outfall Tunnel Project

Project

Pumping Station & Outfall Tunnel Project

Location

Qatar

Status

Completed

Project Category

Infrastructure

Scope of Work

  • CEEQUAL Facilitation for Design & Construction Stage

Project Summary

Conserve Solutions was engaged by the main contractor to lead and facilitate CEEQUAL Assessment during the design and construction phases for this major urban infrastructure project. The initiative includes a high-capacity stormwater pumping station and a 10 km long marine outfall tunnel to efficiently manage Doha’s surface and rainwater drainage. With a capacity of 19.7 m³/s, this program achieved a “Very Good” CEEQUAL rating—the first of its kind in Qatar—demonstrating excellence in sustainability, engineering, and environmental responsibility throughout delivery.