- Qatar Stadium Project – ETS Room Piping Stress Analysis
Qatar Stadium Project – ETS Room Piping Stress Analysis
Project
Qatar Stadium Project – ETS Room Piping Stress Analysis
Location
Qatar
Status
Completed
Project Category
Stadium
Scope of Work
- Stress Analysis for chilled water supply and return lines inside the ETS Room
- Preparation of load data sheets for rigid supports and anchor locations
- Support analysis for the entire chilled water piping network
Project Summary
Conserve Solutions performed detailed piping stress analysis for the ETS Room chilled water piping system at the iconic Stadium, a major venue for the FIFA World Cup 2022 held in Qatar. Using CAESAR II and adhering to ASME B31.1 standards, the analysis included sustained, thermal, and occasional stress checks to ensure the structural integrity of the chilled water system. Comprehensive support analysis and load data sheet preparation were carried out to maintain piping stability and compliance with safety requirements.
FIFA Stadium project, designed by Pattern Architects and managed by Consultant celebrates Qatari cultural heritage with advanced sustainable design features. The work on the piping network has contributed to the stadium’s overall operational efficiency and resilience, supporting Qatar’s vision for high-performance, sustainable sports infrastructure.