Stadium Project

Project

Stadium Project

Location

Qatar

Status

Completed

Project Category

Stadium

Scope of Work

  • Stress and structural analysis for storm water piping
  • Support analysis for all piping inside the pumping station
  • Structural analysis and shop drawing preparation for the piping network

Project Summary

Conserve Solutions executed detailed stress and structural analysis for the storm water piping system within a major stadium infrastructure. This included comprehensive support assessments for all internal piping in the pumping station and the preparation of structural shop drawings for the entire network. The work ensured system reliability and compliance with relevant engineering codes and standards, supporting optimal infrastructure performance and long-term durability.