Conserve Solutions conducted a Level 2 energy audit of a commercial office tower in Doha, Qatar, identifying energy conservation measures with the potential to reduce annual electricity consumption by approximately 24%, with an estimated simple payback period of seven months.
The client was incurring high operating costs due to substantial electricity and water consumption. Conserve Solutions was appointed to conduct a detailed energy audit, assess the performance of building systems and identify opportunities to reduce utility consumption and operating costs.
In addition to high utility expenses, inefficient operation of building systems and unnecessary equipment operating hours can have further financial implications:
The audit aimed to identify the underlying causes of excessive consumption and recommend technically and financially feasible improvements.
Conserve conducted a Level 2 energy audit covering the following activities:
The recommended measures were categorised into low-cost, medium-cost and capital-intensive improvements to help the client prioritise implementation based on technical feasibility, financial returns and available budgets.
The audit identified opportunities to improve the operating efficiency of HVAC equipment and chilled-water systems, particularly during periods of low occupancy and reduced cooling demand.
The principal recommendations included:
Each recommended measure was evaluated for its potential energy savings, implementation cost and financial payback.
Estimated implementation cost
Estimated annual cost savings
Estimated simple payback period
Estimated annual carbon emission reduction
The above savings are projections based on the energy audit findings and proposed conservation measures. Actual savings are subject to implementation and subsequent operating performance.
The energy audit was completed within eight weeks, including data collection, site assessment, engineering analysis and preparation of the final energy audit report.
The report provided the client with a prioritised list of energy conservation measures, estimated implementation costs, potential savings and financial payback periods to support investment and implementation decisions.
The Red Sea Development Company | Hotel
Religious Institution in Australia | Public & Community Facilities
Copyrights © 2026. Conserve Solutions. All Rights Reserved.
BIM Data, Cost & Handover Services
BIM Coordination & Constructability
BIM Modelling & Digital Delivery
BIM Automation & Digital Engineering
Structural & Steel Detailing Services
Architectural Design, Visualization & Presentation Support
BIM Modelling & Digital Delivery