- Inspire
- Innovate
- Integrate
Clash Detection & Resolution services identify and resolve conflicts in BIM models to ensure constructability and project efficiency. This process prevents costly on-site issues by coordinating architectural, structural, and MEP elements early in design.
Clash detection scans 3D BIM models for interferences between building systems, such as ducts clashing with beams or pipes intersecting walls. Using automated tools in Navisworks or Revit, it flags issues for review and correction before construction starts. This coordination step under BIM services enhances model accuracy and supports seamless project delivery for architects, engineers, and contractors.
The process imports federated BIM models from multiple disciplines into clash detection software. Automated checks run against predefined rules, generating reports with visuals of conflicts categorized by severity—hard clashes, clearance violations, or workflow overlaps. Teams collaborate to resolve issues, update source models, and re-verify until the model is clash-free.
Conserve Solutions provides expert BIM coordination and clash detection services with 2mm-5mm tolerance precision. We use Navisworks, Revit, and BIM Track to federate models, run detections, and deliver resolved coordination models. Our workflows include automated scripting for faster reviews and detailed reports for stakeholder sign-off.
We support MEP contractors, general contractors, and owners with clash-free models for key uses
Our drafting services help you
Cuts site surprises by up to 30%.
Avoids rework expenses through early detection.
Speeds approvals and fabrication.
Shared reports unify design teams.
Delivers buildable models with zero clashes.
Minimizes delays and safety issues.
Supports reliable estimating post-resolution.
Navisworks Manage, Revit, BIM 360, and Solibri for detection, reporting, and model federation.
Standard 10mm for soft clashes, 2-5mm for hard clashes, customized per project specs.
Clash reports (PDF/Excel), updated Revit models (RVT/IFC), 3D NWD files, and coordination dashboards.
1-3 weeks based on model size, depending on LOD and complexity.
Copyrights © 2026. Conserve Solutions. All Rights Reserved.Â
BIM Data, Cost & Handover Services
BIM Coordination & Constructability
BIM Modelling & Digital Delivery
BIM Automation & Digital Engineering
Structural & Steel Detailing Services
Architectural Design, Visualization & Presentation Support
BIM Modelling & Digital Delivery