Cinema Theatre project in Qatar

Project

Cinema Theatre project in Qatar

Location

Qatar

Status

Completed

Project Category

Commercial

Scope of Work

Smoke Simulation, Egress Simulation and Thermal Comfort Study using CFD Analysis

Project Summary

  • 3D Model of the complete theatre and its geometry including the location and sizes of the Air outlets.
  • Defining the boundary conditions and input parameters including the temperature, relative humidity, and flow rate at the outlet.
  • Analysis of the system to understand the flow pattern inside the theatre.
  • Evaluated the results and noted the hotspots.
  • Provided suitable Engineering recommendation to overcome the non-conformances noted.